/docsfor

Waterfall

How a total was built, step by step.

import { Waterfall } from "diagrammatic";

Start, four signed steps, end. Connectors and sign colors do the reading. $ millions.

ARR bridge404550plan 45start 42.1+$6.4new+$3.1expand-$1.8contract-$2.4churnend 47.4

Illustrative data. ARR roll-forward, Q2 2025. USD millions.

fig. 48 · ARR bridge, Q2

New logos add 6.4. Expansion adds 3.1. Contraction and churn take 4.2 back. The quarter still closes 2.4 above the 45 plan. Churn is the slab the QBR will stay on.

Use it for
Bridges from a starting figure through gains and losses to an end.
Watch out
Floating bars confuse without connectors and clear sign colors.